Standards Download Free
BS pdf,ASME pdf,ISO pdf,ASTM pdf,AS pdf,GB pdf
BS ISO 20475:2018 pdf free
HomeISO StandardsBS ISO 20475:2018 pdf free
DESCRIPTION

BS ISO 20475:2018 pdf free.Gas cylinders – Cylinder bundles – Periodic inspection and testing.
Depending upon the nature of the operation, an existing bundle may. upon dismantling, be reassembled using the same frame, cylinders and components. Alternatively, frames, cylinders and components may be interchanged for ease of operation during the periodic inspection and testing, provided these parts are in compliance with the type approval of the bundle.
If a replacement of any part o[the bundle takes place at any stage during the periodic inspection and testing. the new parts shall be compatible with the original design type specification and the tare of the bundle shall be adjusted if necessary.
5.2 Identification of cylinders/bundles and preparation for inspections and tests Upon receipt of the bundle for inspection, the gas content within the bundle shall be identified.
Before any work is carried out, the relevant cylinder data and ownership shall be identified and the bundle type approval made available to the inspection body, if necessary.
5.3 Depressurization of manifold and individual cylinders
WARNING — Safety measures shall be taken to protect personnel carrying out the periodic inspection and testing of bundles due to the considerable damage that could be caused from the stored energy if released. The uncontrolled removal of valves from the elements of the bundle can lead to injury, death or property damage. Additional precautions shall be taken when the bundle has been used in flammable gas service.
Cylinders and any pressure-retaining devices, e.g. valves, fittings, hoses, pigtails or piping, shall be depressurized to atmospheric pressure and emptied in a safe, controlled manner before carrying out any inspection or test work on the individual cylinders.
Particular attention shall be given to cylinders containing flammable, oxidizing, corrosive or toxic gases to eliminate risks at the internal inspection stage, e.g. by purging the cylinders and associated fittings prior to devalving and removal from the bundle.
A positive check shall be performed prior to the removal of pressure-retaining devices to ensure these devices are isolated from all pressure sources. This check shall be performed as described in ISO 25760. Residual pressure valves and non-return valves shall be safely overridden to ensure that the cylinders are fully depressurized in accordance with the requirements of ISO 15996.
Main or cylinder valves that are found to be inoperative or blocked shall be depressurized in accordance with the requirements of ISO 25760. In the case of cylinders disassembled from bundles and not equipped with cylinder valves, the cylinder fittings shall be checked to determine whether the gas is able to pass freely from the cylinders, e.g. using the device shown in ISO 25760.
WARNING — Failing to follow ISO 25760 requirements can cause loss of life, injury and/or property damage.
Provided the requirements described in this clause have been met, the manifold and cylinders may be depressurized safely and the corresponding valves may be removed.BS ISO 20475 pdf download.


Tags:
Related Downloads
  • ISO 8600-1-2013 pdf free download.Endoscopes  – Medical endoscopes and endotherapy devices – Part 1: General requirements. 6 Marking 6.1 Minimum marking Iach individual endoscope or endotherapy device shall have the lollowing minimum marking: a) model number and/or other mark sufficient to identify the endoscope or endotherapy device and its manufacturer; b) maximum insertion portion width, minimum instrument channel width, working length, field of view and/or direction of view where such identification is necessary for the intended use of the endoscope or endotherapy device. The Insertion portion width and instrument channel width units shall be in millimetres. The insertion portion width and instrument channel width can also be marked in French size as defined in 3.5, shown by either ‘Fr or an encircled number; c) wherever reasonable and practicable. the endoscope or endotherapy device and detachable component(s) shall be identified in terms of lot numbers or serial numbers, etc. 6.2 Marking legibility The marking shall remain legible over the lifetime of the device when the endoscope or endotherapy device is used, cleaned, disinlected, sterilized and stored in accordance with the instruction manual. 6.3 Marking exceptions When marking on the endoscope or endotherapy device or detachable component(s) is impossible to achieve due…

  • ISO 15688-2012 pdf free download.Road construction and maintenance equipment – Soil stabilizers 一 Terminology and commercial specifications. This International Standard establishes the terminology, definitions of operation and commercial specifications for soil stabilizers and their components intended for use in road construction and pavement works. It does not apply to soil stabilizers used in agricultural applications. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.. ISO 3911, Wheels and rims for pneumatic tyres — Vocabulary, designation and marking ISO 6746-1, Earth-moving machinery — Definitions of dimensions and codes — Part 1: Base machine ISO 6746-2, Earth-moving machinery — Definitions of dimensions and codes — Part 2: Equipment and attachments ISO 7134. Earth-moving machinery — Graders — Terminology and commercial specifications 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 soil stabilizer self-propelled machine, either towed or transported, with the function of pulverizing, breaking-up, aerating, homogenizing, and loosening existing and imported soil or paving materials and mixing them…

  • ISO 18436-1-2012 pdf free.Condition monitoring and diagnostics of machines – Requirements for qualification and assessment of personnel一 Part 1: Requirements for assessment bodies and the assessment process. 5 Requirements for assessment body personnel 5.1 General provisions In order to ensure that the assessment process is carried out effectively and uniformly, the competence requirements for personnel involved in the entire process shall be defined by the assessment body and, in the case of a third party, be approved by the responsible TCC (in accordance with ISO/IEC 17024). The assessment body shall require its personnel (internal or external) to sign a contract, or other document, by which they commit themselves to comply with the rules defined by the assessment body, including those relating to confidentiality and those relating to independence from commercial and other interests, and from any prior or present link with the persons to be examined that would, in the opinion of the interested parties, compromise impartiality. Clearly documented instructions shall be available to the personnel, describing their duties and responsibilities. These instructions shall be maintained up to date. All personnel involved in any aspect of assessment activities shall possess appropriate educational qualifications, experience and technical expertise, which satisfy defined…