Standards Download Free
BS pdf,ASME pdf,ISO pdf,ASTM pdf,AS pdf,GB pdf
BS ISO 27917:2017 pdf free
HomeISO StandardsBS ISO 27917:2017 pdf free
DESCRIPTION

BS ISO 27917:2017 pdf free.Carbon dioxide capture, transportation and geological storage一Vocabulary 一 Cross cutting terms.
CCS project life cycle entirety of phases of a CCS project from concept through to post-closure
Note I to entry: The CCS project life cycle includes mainly concept, design, obtaining permit, construction, operation, monitoring, measurement and verification, decommissioning, closure and post-closure (see Annex 13).
life cycle assessment LCA compilation and evaluation of the inputs, outputs and the potential environmental and health impacts of a CCS project or a component part throughout its life cycle[SOURCE: ISO 14040:2006, 3.2 modified — “and healthN and a CCS project or a component partN have been added and “of a product system” has been deleted. The Note ito entry has been added.]
Note 1 to entry: Boundaries of the assessment include all equipment and processes necessary to evaluate a CCS project or component part. The main input and output flows may include raw materials, process gases. electricity. fossil fuels, water, COz, emission in air and water, solid and liquid waste, co-products, etc.
value chain entire sequence of activities or parties that provide or receive value in the form of products or services [SOURCE: ISO 26000:20 10, 2.25j
CCS energy consumption total energy used within defined boundaries of a CCS project.
Note I to entry: It could be expressed in gigajoules.
intermittency lack of continuity in operation, as measured by the frequency or extent to which a process or installation is stopped or unavailable
Note 1 to entry: Intermittency includes variable C02 flows among project components.
closure period period between the cessation of C02 injection and the demonstration of compliance with the criteria for site closure.post-closure period period that begins after the demonstration of compliance with the criteria for site closure
Note 1 to entry: In some countries, demonstration of compliance may need approval from a third party.
geological storage complex subsurface geological system extending vertically to comprise storage unit(s) and primary and secondary seals, and extending laterally to the defined limits of the CO2 storage project.BS ISO 27917 pdf free download.


Tags:
Related Downloads
  • ISO 8600-1-2013 pdf free download.Endoscopes  – Medical endoscopes and endotherapy devices – Part 1: General requirements. 6 Marking 6.1 Minimum marking Iach individual endoscope or endotherapy device shall have the lollowing minimum marking: a) model number and/or other mark sufficient to identify the endoscope or endotherapy device and its manufacturer; b) maximum insertion portion width, minimum instrument channel width, working length, field of view and/or direction of view where such identification is necessary for the intended use of the endoscope or endotherapy device. The Insertion portion width and instrument channel width units shall be in millimetres. The insertion portion width and instrument channel width can also be marked in French size as defined in 3.5, shown by either ‘Fr or an encircled number; c) wherever reasonable and practicable. the endoscope or endotherapy device and detachable component(s) shall be identified in terms of lot numbers or serial numbers, etc. 6.2 Marking legibility The marking shall remain legible over the lifetime of the device when the endoscope or endotherapy device is used, cleaned, disinlected, sterilized and stored in accordance with the instruction manual. 6.3 Marking exceptions When marking on the endoscope or endotherapy device or detachable component(s) is impossible to achieve due…

  • ISO 15688-2012 pdf free download.Road construction and maintenance equipment – Soil stabilizers 一 Terminology and commercial specifications. This International Standard establishes the terminology, definitions of operation and commercial specifications for soil stabilizers and their components intended for use in road construction and pavement works. It does not apply to soil stabilizers used in agricultural applications. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.. ISO 3911, Wheels and rims for pneumatic tyres — Vocabulary, designation and marking ISO 6746-1, Earth-moving machinery — Definitions of dimensions and codes — Part 1: Base machine ISO 6746-2, Earth-moving machinery — Definitions of dimensions and codes — Part 2: Equipment and attachments ISO 7134. Earth-moving machinery — Graders — Terminology and commercial specifications 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 soil stabilizer self-propelled machine, either towed or transported, with the function of pulverizing, breaking-up, aerating, homogenizing, and loosening existing and imported soil or paving materials and mixing them…

  • ISO 18436-1-2012 pdf free.Condition monitoring and diagnostics of machines – Requirements for qualification and assessment of personnel一 Part 1: Requirements for assessment bodies and the assessment process. 5 Requirements for assessment body personnel 5.1 General provisions In order to ensure that the assessment process is carried out effectively and uniformly, the competence requirements for personnel involved in the entire process shall be defined by the assessment body and, in the case of a third party, be approved by the responsible TCC (in accordance with ISO/IEC 17024). The assessment body shall require its personnel (internal or external) to sign a contract, or other document, by which they commit themselves to comply with the rules defined by the assessment body, including those relating to confidentiality and those relating to independence from commercial and other interests, and from any prior or present link with the persons to be examined that would, in the opinion of the interested parties, compromise impartiality. Clearly documented instructions shall be available to the personnel, describing their duties and responsibilities. These instructions shall be maintained up to date. All personnel involved in any aspect of assessment activities shall possess appropriate educational qualifications, experience and technical expertise, which satisfy defined…