ISO 1070-2018 pdf free.Hydrometry一Slope-area method.
The slope—area method is most often used to document a flood or very high flow event. The friction slope defined in the flow resistance formulae is approximated by surveying high-water marks on both banks within the measuring reach to determine the change in water surface elevation, determining the velocity heads at each section, and evaluating the loss due to contraction or expansion. The high- water marks should extend upstream of the most upstream cross section and downstream of the most downstream cross section. The high-water marks may consist of drift on banks, wash lines, seed lines on trees, mud lines, and drift in bushes or trees. Each high-water mark should be rated as excellent, good, fair or poor, which will help with interpreting the high-water profile and slope. Mud lines and seed lines on tree trunks or structures typically are excellent high-water marks. Drift and wash lines are usually good, fair or poor depending on the tendency of the stream bank vegetation to bounce back from the forces exerted on it by the flowing water. Care should be exercised in using high-water marks on trees and other obstacles in high-velocity areas because they may be more representative of the total energy than the water level, which will reduce the accuracy of the computed discharge.
The high-water marks should be surveyed as soon as possible after the flood. If this is not practical, the marks should he preserved with paint, nails, flagging or labels until the survey can be done.
6.2 Crest-stage gauges
If the site is to be used for periodic measurement of high flows, a series of crest-stage gauges installed on each side of the reach can be used to determine the high-water profile and slope. There should be at least one crest-stage gauge at the left and right bank of each cross section; cross-section locations should reflect known hydraulic changes in the measurement reach (observed slope breaks in the high- water profile, for example). The crest-stage gauges should conform to ISO 4373.
6.3 Pressure transmitters
If the site is to be used for periodic measurement of high flow or continuous measurement of flood hydrographs, a series of recording gauges installed on each side of the reach can be used to determine the high-water profile and slope; as noted in fL2. cross-section locations should reflect any known hydraulic changes in the measurement reach. The recording devices can be individual water-level recording gauges, or a series of pressure transmitters connected to a single data logger or recorder.
6.4 Reference gauge
The water levels determined by surveying high-water marks or from crest-stage or recording gauges should be referenced to national or local datum by precise levelling to the nearest benchmark. If the site is maintained as a stage-discharge gauging station, the water levels should be surveyed to the reference gauge whether it is a vertical staff gauge or inclined gauge. The reference gauge shall conform to ISO 4373 and be securely fixed to an immovable, rigid support in the stream or river.ISO 1070 pdf free download.


Tags:
Related Downloads
  • ISO 8600-1-2013 pdf free download.Endoscopes  – Medical endoscopes and endotherapy devices – Part 1: General requirements. 6 Marking 6.1 Minimum marking Iach individual endoscope or endotherapy device shall have the lollowing minimum marking: a) model number and/or other mark sufficient to identify the endoscope or endotherapy device and its manufacturer; b) maximum insertion portion width, minimum instrument channel width, working length, field of view and/or direction of view where such identification is necessary for the intended use of the endoscope or endotherapy device. The Insertion portion width and instrument channel width units shall be in millimetres. The insertion portion width and instrument channel width can also be marked in French size as defined in 3.5, shown by either ‘Fr or an encircled number; c) wherever reasonable and practicable. the endoscope or endotherapy device and detachable component(s) shall be identified in terms of lot numbers or serial numbers, etc. 6.2 Marking legibility The marking shall remain legible over the lifetime of the device when the endoscope or endotherapy device is used, cleaned, disinlected, sterilized and stored in accordance with the instruction manual. 6.3 Marking exceptions When marking on the endoscope or endotherapy device or detachable component(s) is impossible to achieve due…

  • ISO 15688-2012 pdf free download.Road construction and maintenance equipment – Soil stabilizers 一 Terminology and commercial specifications. This International Standard establishes the terminology, definitions of operation and commercial specifications for soil stabilizers and their components intended for use in road construction and pavement works. It does not apply to soil stabilizers used in agricultural applications. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.. ISO 3911, Wheels and rims for pneumatic tyres — Vocabulary, designation and marking ISO 6746-1, Earth-moving machinery — Definitions of dimensions and codes — Part 1: Base machine ISO 6746-2, Earth-moving machinery — Definitions of dimensions and codes — Part 2: Equipment and attachments ISO 7134. Earth-moving machinery — Graders — Terminology and commercial specifications 3 Terms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 soil stabilizer self-propelled machine, either towed or transported, with the function of pulverizing, breaking-up, aerating, homogenizing, and loosening existing and imported soil or paving materials and mixing them…

  • ISO 18436-1-2012 pdf free.Condition monitoring and diagnostics of machines – Requirements for qualification and assessment of personnel一 Part 1: Requirements for assessment bodies and the assessment process. 5 Requirements for assessment body personnel 5.1 General provisions In order to ensure that the assessment process is carried out effectively and uniformly, the competence requirements for personnel involved in the entire process shall be defined by the assessment body and, in the case of a third party, be approved by the responsible TCC (in accordance with ISO/IEC 17024). The assessment body shall require its personnel (internal or external) to sign a contract, or other document, by which they commit themselves to comply with the rules defined by the assessment body, including those relating to confidentiality and those relating to independence from commercial and other interests, and from any prior or present link with the persons to be examined that would, in the opinion of the interested parties, compromise impartiality. Clearly documented instructions shall be available to the personnel, describing their duties and responsibilities. These instructions shall be maintained up to date. All personnel involved in any aspect of assessment activities shall possess appropriate educational qualifications, experience and technical expertise, which satisfy defined…